Paraburdoo Tailings Storage Facility TSF1 Southern Cell

Paraburdoo Tailings Storage Facility TSF1 Southern Cell

Location: Paraburdoo, WA Client: Rio Tinto Duration: January 2017 – June 2017 Works consisted of a 2m upstream raise of the existing facilities western and southern saddle dam embankments.  Construction of new access tracks with several floodways, rock pitched...
Marandoo Waste Fines Storage Facility WFSF Stage 3

Marandoo Waste Fines Storage Facility WFSF Stage 3

Location: Marandoo near Tom Price, WA Client: Rio Tinto Duration: June 2015 – February 2016 Bulk and detailed earthworks consisting of a 6 meter embankment lift of a downstream tailings dam. Modifications, extensions, dismantling and reinstating of...
Marandoo Waste Fines Storage Facility WFSF Stage 2

Marandoo Waste Fines Storage Facility WFSF Stage 2

Location: Marandoo near Tom Price, WA Client: Rio Tinto Duration: December 2014 – June 2015 Bulk and detailed earthworks consisting of a 4 metre embankment lift of a downstream tailings dam. Modifications, extensions, dismantling and reinstating of...