Location: Tom Price, WA
Client: Shire of Ashburton
Duration: November 2017 – May 2018
Removal and disposal of existing drainage infrastructure including road pavement, kerbs, footpaths and driveways, to facilitate installation of new rubber ring jointed concrete pipe, pits and lids; and reinstate roads, kerbs, footpaths and driveways. All completed in-house.
- 1,380m of concrete pipe installed. Ranging from 300mm diameter to 900mm diameter. Deepest trench depth of 2.5m;
- 80no. concrete pits and lids installed;
- Cement stabilised fill;
- Spray seal;
- Non-destructive service locating;
- Traffic management;
- Noise management;
- Nil complaints from the public.