Tom Price Storm Water Drainage Renewal

Tom Price Storm Water Drainage Renewal

Demolition of existing to facilitate the installation of new drainage infrastructure and reinstate roads, kerbs, footpaths and driveways.
Detailed earthworks stormwater drainage works in the Pilbara

Location: Tom Price, WA

Client: Shire of Ashburton

Duration: November 2017 – May 2018

Removal and disposal of existing drainage infrastructure including road pavement, kerbs, footpaths and driveways, to facilitate installation of new rubber ring jointed concrete pipe, pits and lids; and reinstate roads, kerbs, footpaths and driveways. All completed in-house.

  • 1,380m of concrete pipe installed. Ranging from 300mm diameter to 900mm diameter. Deepest trench depth of 2.5m;
  • 80no. concrete pits and lids installed;
  • Cement stabilised fill;
  • Spray seal;
  • Non-destructive service locating;
  • Traffic management;
  • Noise management;
  • Nil complaints from the public.

metres of culverts installed

concrete items installed

Detailed earthworks stormwater drainage works in the Pilbara