by Alvin Lai | Dec 1, 2018
Location: Karratha, WA Client: Rio Tinto, Calibre Duration: May 2018 – December 2018 Works to create a new arrival road and crossover undertaken in the 7 Mile Rail Yard in Karratha; includes: Clearing, grubbing and topsoil stripping to stockpile; Construction of...
by Alvin Lai | Nov 1, 2018
Location: Tom Price Mainline between Karratha and Tom Price, WA Client: Rio Tinto, Ansaldo Duration: June 2018 – November 2018 Detailed earthworks at 11 sites alongside an active rail network from Karratha to Tom Price for future autonomous train infrastructure...
by Alvin Lai | May 1, 2018
Location: Tom Price, WA Client: Shire of Ashburton Duration: November 2017 – May 2018 Removal and disposal of existing drainage infrastructure including road pavement, kerbs, footpaths and driveways, to facilitate installation of new rubber ring jointed concrete...
by Alvin Lai | Jan 1, 2018
Location: Tom Price, WA Client: Rio Tinto Duration: May 2017 – January 2018 Removal and disposal of existing pipe and infrastructure, installation of temporary pipework, to enable continued deposition whilst 305,000m3 of bulk and detailed earthworks for several...
by Alvin Lai | Jul 1, 2017
Location: Mesa A near Pannawonica, WA Client: Rio Tinto Duration: January 2017 – July 2017 Early works consisted of the detailed design, site geotechnical and services investigation and reporting followed by a joint Client/Contractor design and safety review. ...