by Alvin Lai | Jan 1, 2020
Location: Paraburdoo, WA Client: Rio Tinto Duration: January 2020 – January 2020 Some drainage improvements to the Paraburdoo TSF1 Southern Cell including installing rock protection on the upstream face of embankments to protect from further scouring. Install a...
by Alvin Lai | Aug 1, 2019
Location: Marandoo near Tom Price, WA Client: Rio Tinto Duration: August 2019 – August 2019 Some improvements to the Marandoo SWFSF tailings storage facility including screening and placing rock protection along the upstream toe of the SWFSF embankments to RL...
by Alvin Lai | Apr 1, 2019
Location: Hope Downs 1 near Newman, WA Client: Rio Tinto, Calibre Duration: March 2019 – April 2019 Earthworks and drainage works at the Lang Hancock Spur, LHRX 453km, both the main level crossing and the diversion level crossing, and North of the 453km...
by Alvin Lai | Apr 1, 2019
Location: Mesa J near Pannawonica, WA Client: Rio Tinto Duration: November 2018 – April 2019 Earthworks and sealing works to improve drainage and pavement at the Mesa J Warehouse Storage Area and Admin Carpark Area totalling 8,000 m2. Box-out in situ material...
by Alvin Lai | Dec 1, 2018
Location: Karratha, WA Client: Rio Tinto, Calibre Duration: May 2018 – December 2018 Works to create a new arrival road and crossover undertaken in the 7 Mile Rail Yard in Karratha; includes: Clearing, grubbing and topsoil stripping to stockpile; Construction of...