Location: Hope Downs 1 near Newman, WA
Client: Rio Tinto, Calibre
Duration: March 2019 – April 2019
Earthworks and drainage works at the Lang Hancock Spur, LHRX 453km, both the main level crossing and the diversion level crossing, and North of the 453km crossing, construct a 2m high berm along the communications pad and drainage channel.
- Remove 160m of 900mm diameter culverts and replace with 1200mm to 1800mm diameter culverts using cement stabilised fill;
- 750 tonnes of rock protection installed;
- Earthworks to improve drainage;
- Pavement construction;
- Spray seal;
- Non-destructive service locating to locate the fibre optic cable at the communications pad;
- Rehabilitation;
- Supply and install stock fencing and gate.