Lang Hancock Rail Drainage Works

Lang Hancock Rail Drainage Works

Supply and installation of 4no. 1.2m diameter and 2no. 1.8m diameter CSP culverts at the rail crossing along the Hope Downs 1 access road.
Drainage works, culvert installation in the Pilbara

Location: Hope Downs 1 near Newman, WA

Client: Rio Tinto, Calibre

Duration: March 2019 – April 2019

Earthworks and drainage works at the Lang Hancock Spur, LHRX 453km, both the main level crossing and the diversion level crossing, and North of the 453km crossing, construct a 2m high berm along the communications pad and drainage channel.

  • Remove 160m of 900mm diameter culverts and replace with 1200mm to 1800mm diameter culverts using cement stabilised fill;
  • 750 tonnes of rock protection installed;
  • Earthworks to improve drainage;
  • Pavement construction;
  • Spray seal;
  • Non-destructive service locating to locate the fibre optic cable at the communications pad;
  • Rehabilitation;
  • Supply and install stock fencing and gate.