Lang Hancock Rail Drainage Works

Lang Hancock Rail Drainage Works

Location: Hope Downs 1 near Newman, WA Client: Rio Tinto, Calibre Duration: March 2019 – April 2019 Earthworks and drainage works at the Lang Hancock Spur, LHRX 453km, both the main level crossing and the diversion level crossing, and North of the 453km...
51 Road Rail

51 Road Rail

Location: Karratha, WA Client: Rio Tinto, Calibre Duration: May 2018 – December 2018 Works to create a new arrival road and crossover undertaken in the 7 Mile Rail Yard in Karratha; includes: Clearing, grubbing and topsoil stripping to stockpile; Construction of...
Midblock Earthworks

Midblock Earthworks

Location: Tom Price Mainline between Karratha and Tom Price, WA Client: Rio Tinto, Ansaldo Duration: June 2018 – November 2018 Detailed earthworks at 11 sites alongside an active rail network from Karratha to Tom Price for future autonomous train infrastructure...
Track Remediation Works – Tom Price Mainline (84KP)

Track Remediation Works – Tom Price Mainline (84KP)

Location: Tom Price Mainline (84KP) near Karratha, WA Client: Rio Tinto, Calibre Duration: September 2018 – September 2018 Works included the removal and replacement of the existing rail embankment formation during a Mine Shut under 50 hours. Works passed...
Track Remediation Works – Tom Price Mainline (29KP)

Track Remediation Works – Tom Price Mainline (29KP)

Location: Tom Price Mainline (29KP) near Karratha, WA Client: Rio Tinto, Calibre Duration: July 2018 – July 2018 Works included the removal and replacement of the existing rail formation during a Mine Shut under 50 hours. Works passed through a Super Site...