by Alvin Lai | Oct 1, 2024
Location: Western Turner Syncline 2 near Tom Price, WA Client: Rio Tinto Duration: June 2024 – October 2024 A great project to have been a part of. The team appreciated being part of the discussions to co-design on the scope variations. We received early access...
by Alvin Lai | May 1, 2024
Location: Mesa J near Pannawonica, WA Client: Rio Tinto Duration: May 2022 – December 2023, July 2022 – May 2024, November 2022 – June 2024 Our largest operation to date with continuous projects and their scope variations awarded. 2.5 million tonnes...
by Alvin Lai | Feb 1, 2022
Location: Greater Rhodes Ridge near Newman, WA Client: Rio Tinto Duration: November 2021 – February 2022 Construction of Baker’s North Laydown Area, including the associated access roads, delineation windrows, drainage and sedimentation pond. Clearing,...
by Alvin Lai | Feb 1, 2022
Location: Paraburdoo, WA Client: Rio Tinto Duration: January 2021 – February 2022 As the Northern Cell’s eastern tailings deposition pipeline feeds the Southern Cell, it had to be relocated outside of the raise’s embankment footprint for the Southern...
by Alvin Lai | Nov 1, 2020
Location: Paraburdoo, WA Client: Rio Tinto Duration: September 2020 – November 2020 Trial conducted to rock armour waste dumps where access for typical rehabilitation earthworks was constrained or the slope was too steep to safely bench or push down the slope....