by Alvin Lai | Apr 1, 2019
Location: Hope Downs 1 near Newman, WA Client: Rio Tinto, Calibre Duration: March 2019 – April 2019 Earthworks and drainage works at the Lang Hancock Spur, LHRX 453km, both the main level crossing and the diversion level crossing, and North of the 453km...
by Alvin Lai | May 1, 2018
Location: Marandoo near Tom Price, WA Client: Rio Tinto, Calibre Duration: May 2018 – May 2018 Works included the removal and replacement of the existing rail formation and two rail level crossings during a Mine Shut under 50 hours. Clear, grub and topsoil...
by Alvin Lai | Jan 1, 2018
Location: Tom Price, WA Client: Rio Tinto Duration: May 2017 – January 2018 Removal and disposal of existing pipe and infrastructure, installation of temporary pipework, to enable continued deposition whilst 305,000m3 of bulk and detailed earthworks for several...
by Alvin Lai | Apr 1, 2014
Location: Rio Tinto Rail Network spanning to Karratha, Cape Lambert, Brockman 4, Tom Price, Paraburdoo, Marandoo, Yandicoogina, West Angelas and Hope Downs 4 Client: Rio Tinto, Calibre Duration: May 2012 – April 2014 Detailed earthworks at 40+ sites alongside an...