Location: Marandoo near Tom Price, WA
Client: Rio Tinto, Calibre
Duration: May 2018 – May 2018
Works included the removal and replacement of the existing rail formation and two rail level crossings during a Mine Shut under 50 hours.
- Clear, grub and topsoil strip;
- Removed and constructed 410m of rail formation to strict levels;
- Staged construction of two rail level crossings to manage traffic, including the supply and install of the T-pieces;
- Installed sub-soil drainage;
- Line marking;
- Rehabilitation;
- Nil incidents.