Western Turner Syncline 2 S17 Culverts

Western Turner Syncline 2 S17 Culverts

Location: Western Turner Syncline 2 near Tom Price, WA Client: Rio Tinto Duration: May 2023 – July 2023 A nice simple project delivering a flood management solution so the S17 Haul Road can remain operational all year round when the creek floods. Clearing,...
Greater Rhodes Ridge Roads and Drainage

Greater Rhodes Ridge Roads and Drainage

Location: Greater Rhodes Ridge near Newman, WA Client: Rio Tinto Duration: November 2021 – February 2022 Construction of Baker’s North Laydown Area, including the associated access roads, delineation windrows, drainage and sedimentation pond. Clearing,...
Paraburdoo Tailings Storage Facility TSF1 Northern Cell

Paraburdoo Tailings Storage Facility TSF1 Northern Cell

Location: Paraburdoo, WA Client: Rio Tinto Duration: January 2021 – February 2022 As the Northern Cell’s eastern tailings deposition pipeline feeds the Southern Cell, it had to be relocated outside of the raise’s embankment footprint for the Southern...
Yandicoogina Waste Fines Cell WFC3A Extension

Yandicoogina Waste Fines Cell WFC3A Extension

Location: Yandicoogina near Newman, WA Client: Rio Tinto Duration: October 2020 – December 2020 Our first in-pit tailings storage facility. OD400 (DN400) SDR7.4 PN25 PE100 HDPE pipelines were flanged every 40m up until the 600mm diameter culverts installed. The...
Mesa J Tailings Storage Facility TSF3 Stage 2

Mesa J Tailings Storage Facility TSF3 Stage 2

Location: Mesa J near Pannawonica, WA Client: Rio Tinto Duration: February 2020 – September 2020 Mobilised, set-up site, constructed Embankment 9 (approximately 88,300 m3) and established the pipeline access road and installed 1.3 km of HDPE-lined steel and HDPE...