Paraburdoo Temporary Tank Earthworks

Paraburdoo Temporary Tank Earthworks

Location: Paraburdoo, WA Client: Rio Tinto Duration: November 2024 – December 2024 The team quickly mobilised to site to construct a pad in the pit within 2 weeks, before the tank installation contractor arrived on site. Additional volume of mine waste was...
Mesa J Tailings Storage Facility TSF4 and TSF8

Mesa J Tailings Storage Facility TSF4 and TSF8

Location: Mesa J near Pannawonica, WA Client: Rio Tinto Duration: May 2022 – December 2023, July 2022 – May 2024, November 2022 – June 2024 Our largest operation to date with continuous projects and their scope variations awarded. 2.5 million tonnes...
Paraburdoo Tailings Storage Facility TSF1 Northern Cell

Paraburdoo Tailings Storage Facility TSF1 Northern Cell

Location: Paraburdoo, WA Client: Rio Tinto Duration: January 2021 – February 2022 As the Northern Cell’s eastern tailings deposition pipeline feeds the Southern Cell, it had to be relocated outside of the raise’s embankment footprint for the Southern...
Channar Rock Armour Trial

Channar Rock Armour Trial

Location: Paraburdoo, WA Client: Rio Tinto Duration: September 2020 – November 2020 Trial conducted to rock armour waste dumps where access for typical rehabilitation earthworks was constrained or the slope was too steep to safely bench or push down the slope....
Paraburdoo Stockpile Screening and Recovery

Paraburdoo Stockpile Screening and Recovery

Location: Paraburdoo, WA Client: Rio Tinto Duration: August 2019 – February 2020 Screened bulked-out iron ore stockpiled on Stockpile 5 in the Paraburdoo Stockyards. Screened iron ore spillage stockpiled near the “S-bend”. Screened iron ore spillage...