Location: Rio Tinto Rail Network spanning to Karratha, Cape Lambert, Brockman 4, Tom Price, Paraburdoo, Marandoo, Yandicoogina, West Angelas and Hope Downs 4
Client: Rio Tinto, Calibre
Duration: September 2013 – March 2015
Earthworks for new and existing level crossings and rail maintenance tracks including the supply installation of road furniture, sealing works and line marking. Supply and installation of passive level crossing gates and rail formation works.
- 70 Gate installations
- 30 Level Crossings
- 350,000 Square metres of 2-coat seal